All grant recipients are required to agree to the terms and conditions outlined here before receiving funds.
| 1 | Background |
1.1 Manifold for Charity, 1621 E 6th Street Unit 1440, Austin, TX 78702, United States, a registered 501(c)3-nonprofit with EIN 88-3668801 (the “Charity”). 1.2 Emil Fournier (the “Recipient”) 1.3 Based on the information provided to Manifold for Charity, this grant is to be used exclusively for the following purposes in accordance with the terms and conditions of this letter, unless otherwise approved in advance [in writing] by Manifold for Charity: "Arbor – Using AI to Restore Nature Worldwide" (the “Project”). 1.4 The start date for this grant will be November 25th, 2026 (the “Commencement Date”) and will run for the duration (the “Grant Period”) until the Recipient marks the Project as complete (the “Expiry Date”). 1.5 The Charity has not yet decided to give this grant. Rather, it has been recommended to the Charity to give this grant. After the signing of this agreement, the Charity will review the grant application and may decide not to send funds to the Recipient if the Project is not in line with the Charity’s mission. | |
| 2 | Purpose and Use of Grant |
2.1 The Grant is conditional on the satisfactory use of the money and on compliance with the terms of this Agreement. 2.2 The Recipient shall not make any substantive change to the Project without the Charity’s prior written agreement. 2.3 Should any part of the Grant remain unspent at the end of the Grant Period, the Recipient shall ensure that the unspent money is returned to the Charity. | |
| 3 | Prohibited Uses |
3.1 The Recipient shall not use the Grant: (a) Otherwise than for the purposes which fall within the charitable purposes of the Recipient, or to undertake an activity for any purpose other than a religious, charitable, scientific, literary, educational, or other purpose specified in Section 170(c)(2)(B) of the Internal Revenue Code (“IRC”). (b) To attempt to influence legislation, within the meaning of Section 501(c)(3) of the IRC. (c) To participate or intervene in any political campaign on behalf of or in opposition to any candidate for public office, to induce or encourage violations of law or public policy, to cause any private inurement or improper private benefit to occur, or to take any other action inconsistent with Section 501(c)(3) of the IRC. | |
| 4 | Monitoring and Reporting |
4.1 The Recipient is responsible for ensuring that the purposes for which the Grant is given are being met throughout the Grant Period and that the terms of this letter are being adhered to. 4.2 Upon the Charity’s request, the Recipient shall share a progress report every 6 months from the Commencement Date and shall share a final report upon the Expiry Date. If applicable, the Recipient shall receive instructions for submitting the report before it is due. | |
| 5 | Payment, Withholding, and Recovery of the Grant |
5.1 The Charity may at its discretion withhold or suspend payment of the Grant and/or require repayment of all or part of the Grant and/or terminate this Agreement if: (a) the Recipient uses any of the Grant for purposes other than those for which they have been awarded. (b) all activities associated with the Project are not run in accordance with all statutory or other regulatory requirements in the country where the Recipient is established and in the country where the Project takes place, and in a manner consistent with the good name and reputation of the Charity. (c) the Charity reasonably considers that the Recipient has not made satisfactory progress with the delivery of the Project, in which case any repayment shall be no greater than the unspent balance of the grant. (d) the Recipient provides the Charity with any materially misleading or inaccurate information. (e) the Recipient ceases to work on the Project for any reason. (f) the Recipient fails to comply with any of the terms and conditions of this Agreement. 5.2 The Recipient agrees and acknowledges that the Grant is expressed as a maximum sum and is not a guaranteed payment. It shall be paid only to the extent that the Charity has available funds. The Charity does it all it can to keep fees low and foreign exchange rates fair, however, due to the nature of these fees, the amount the Recipient receives may be reduced by bank transfer fees and, for international transfers, also by forex fees. 5.3 The Recipient shall promptly repay to the Charity any money incorrectly paid to it either as a result of an administrative error or otherwise. This includes (without limitation) situations where either an incorrect sum of money has been paid or where Grant money has been paid in error before all conditions attaching to the Grant have been complied with by the Recipient. 5.4 If the Charity exercises its right to terminate pursuant to Section 5.1, then without prejudice to any other rights and remedies of the Charity, the Recipient shall, at the Charity’s sole discretion, return any remaining part of the Grant to the Charity, or any money that has not been used in accordance with Section 2 of this Agreement. 5.5 The Charity will make the payment using the standard payment routes, but the onus is on the Recipient to help the Charity complete the payment if those routes fail, for example, by providing alternative bank accounts or payment methods, subject to the Charity's acceptance. | |
| 6 | Limitation of Liability |
| The Charity accepts no liability for any consequences, whether direct or indirect, that may come about from the Recipient running the Project, the use of the Grant or from withdrawal of the Grant. The Recipient shall indemnify and hold harmless the Charity, its employees, agents, officers or subcontractors with respect to all claims, demands, actions, costs, expenses, losses, damages and all other liabilities arising from or incurred by reason of the Recipient’s actions and/or omissions in relation to the Project, the non-fulfilment of the Recipient’s obligations under this letter or the Recipient’s obligations to third parties. Subject to the foregoing, the Charity’s liability under this letter is limited to the payment of the Grant. | |
| 7 | Personal taxes |
| If applicable, the Recipient is responsible to pay when due all local taxes, duties, and other governmental fees, taxes or other governmental charges that may apply to personal income. The Grant shall not be increased in the event of any tax become payable on the Grant money. The Grant may be classified as taxable income. It is up to the Recipient to check with an accountant or tax professional to see whether they need to declare the Grant for tax purposes. | |
| 8 | Federal tax law compliance |
| Recipient acknowledges that it understands its obligations imposed by this Agreement, including but not limited to those obligations imposed by reference to the IRC. Recipient agrees that if Recipient has any doubts about its obligations under this Agreement, including those incorporated by reference to the IRC, Recipient will promptly contact Charity or its own legal counsel. | |
| 9 | No employment |
| The making of this Grant does not represent or imply any kind of employment relationship between the Recipient and the Charity. | |
| 10 | Publications; License |
| Any information contained in publications, studies, or research funded by this Grant shall be made available to the public following such reasonable requirements or procedures as Charity may establish from time to time. Promptly after creation of any publications, studies, or research funded by this Grant, Recipient agrees to grant to Charity an irrevocable, worldwide, nonexclusive, fully-paid up license to publish, in Charity’s discretion, such intellectual property, and to execute promptly any documents and instruments that the Charity may reasonably request in order to effect such license, without further consideration. | |
| 11 | No Agency |
| Recipient is solely responsible for all activities supported by the Grant funds, the content of any product created with the Grant funds, and the manner in which any such product may be disseminated. This Agreement shall not create any agency relationship, partnership, or joint venture between the parties, and Recipient shall make no such representation to anyone. | |
| 12 | Terrorist Activity |
| Recipient warrants that it does not support or conduct, directly or indirectly, violence or terrorist activity of any kind. | |
| 13 | Variations |
| No variation of this Agreement shall be effective unless it is in writing and signed by or on behalf of each party. | |
| 14 | Entire agreement |
| This Agreement is the entire agreement between the parties, and replaces all previous agreements and understandings between them, relating to its subject matter. | |
| 15 | Governing Law |
| This Agreement shall be governed by the laws of the State of California applicable to contracts to be performed entirely within the State. |
The project's title and description when this agreement was signed on November 25th, 2026. The project page shows the current version, which its creator may have edited since.
We are building Arbor to predict how ecosystems evolve over time and investigate how these predictions could help specialists restore degraded ecosystems.
We are two 17-year-old students from Switzerland and best friends. We started GreenTrust AI because we were interested in how AI could be used more efficiently. We then started building and training our own models and wanted to apply what we were learning to a real-world problem.
One evening, after watching a documentary about the Amazon rainforest, we started discussing how AI could help with ecological restoration. This is how we came up with the idea of Arbor.
Our initial focus is Brazil, where we are combining historical satellite observations, environmental datasets and machine learning to study the Amazon, Cerrado and Atlantic Forest biomes.
We have already built an experimental prototype where we can select a geographical area, generate a one-year prediction and calculate an ecological score using a preliminary mathematical formula. These predictions have not yet been scientifically validated.
We are seeking between $500 and $44,000 to develop and evaluate our ecological forecasting models, with the objective of having a working demonstrator by June 2027.
More information is available on our website.
When an organization wants to restore a plot of land, it doesn't necessarily know how the land will evolve over the next few years. Two plots of land that look similar today might evolve differently because of their soil conditions, climate or environmental history.
If restoration practitioners could better understand which areas are likely to recover naturally and which ones require intervention, they could potentially make better use of their available resources.
We first want Arbor to forecast how plots of land will evolve over time. We then want to investigate how these predictions could help develop restoration strategies.
1. Environmental data infrastructure
We are integrating historical and spatial data on land use, weather conditions, deforestation and other environmental variables. Our sources include MapBiomas, OpenLandMap and SoilGrids.
One approach we are currently exploring is a pyramidal data structure, with spatial resolutions ranging from around 20–30 meters to approximately 9 km per pixel. We want our models to have access to both local environmental conditions and information at larger geographical scales.
The implementation and evaluation of this structure are still at an early stage.
2. Develop predictive models of ecosystem dynamics
The model will take environmental variables such as vegetation indicators, fire history, soil composition and soil pH as inputs. We want to predict the evolution of variables related to vegetation, soil, water and fire, depending on what can be predicted reliably.
We will also use these predictions to calculate an overall ecological score with the mathematical formula we have been developing. This formula is still experimental and has not yet been scientifically validated.
Our initial objective is to make yearly predictions over a period of 10 years, which we would like to extend to 20 years in the future.
In our preliminary experiments, our model did not outperform a persistence model overall. Many environmental conditions remain relatively stable from one year to the next, making it difficult to outperform a model that simply predicts no change.
This made us reconsider parts of our initial approach. We are currently reworking our data input format and preparing more rigorous experiments.
We also want Arbor to provide uncertainty estimates and are considering methods such as ensembles of models and probabilistic approaches.
3. Model validation
Before investing too much in complex architectures, we want to understand what simpler models can already predict from our data.
We plan to compare deep learning models with Markov models, persistence models and naive Bayes classifiers where appropriate. If simpler models perform better for certain variables, there would be little reason to use a more complex model for those predictions.
We have already initiated discussions with scientific experts, including Dr. Florian Zellweger, whose research focuses on forest ecosystems and microclimates.
4. Translate predictions into restoration tools
We want restoration practitioners to be able to select a plot of land on a map and access its historical environmental data, predictions and associated uncertainty through graphs and other visual representations.
Existing research, such as the 2024 Nature study Global potential for natural regeneration in deforested tropical regions, has already explored the use of machine learning for ecological restoration.
With Arbor, we want to investigate whether combining predictions of several environmental variables over time and at different spatial scales could provide a useful basis for restoration planning.
Our first demonstrator will not provide restoration strategies. In a later development phase, we want to explore reasoning capabilities and potentially develop several specialized models focusing on different aspects of an ecosystem.
Predicting the effects of restoration interventions will require additional data, research and scientific validation.
We want to determine whether deep learning provides an improvement over simpler approaches to ecological forecasting.
We will evaluate our models based on the following criteria:
Predictive performance: Use historical data available up to a given year to predict environmental conditions in subsequent years, then compare predictions with observations excluded from training and model selection. We plan to use MAE and RMSE for continuous variables and F1-score for classification tasks, with an initial prediction horizon of 10 years.
Prediction of environmental changes: Evaluate performance separately on stable areas and areas that have undergone environmental changes.
Geographical generalization: Test the models on areas excluded from training and, with sufficient funding, compare their performance across the three Brazilian biomes.
Uncertainty calibration: Evaluate whether the uncertainty estimated by our models corresponds to their observed prediction errors. If we use prediction intervals, we will assess their coverage and width.
Scientific assessment: Ask researchers to review our methodology, choice of variables and ecological scoring formula. The formula will need to account for differences between ecosystems, as an increase in tree cover is not necessarily an ecological improvement in naturally open ecosystems.
Practical usefulness: With sufficient funding, ask restoration practitioners to test our demonstrator and identify which information is useful or missing.
Research report
We are preparing a first research report on Arbor, which we aim to complete by December 12, 2026. It will cover our methodology, data preparation, initial experiments, benchmarks, computational estimates and the limitations of our approach. We intend to make it publicly available and share it on this page.
Development milestones
We plan to prepare our datasets, establish baseline results and conduct smaller training experiments before committing more computational resources to promising approaches.
By June 2027, we aim to have a working demonstrator displaying ecological predictions, graphs and, where possible, their associated uncertainty.
We intend to publish our methodology, benchmark results and scientific findings, including negative results, as well as our ecological scoring formula.
Accurate environmental predictions do not automatically translate into successful ecological restoration. Demonstrating an improvement in real-world restoration outcomes would require longer-term field studies and collaborations.
We are seeking between $500 and $44,000. For the full development phase, we currently estimate that we will need a computational budget equivalent to around 6,000 hours of H100 GPU rental and between 1 and 10 TiB of storage. Each budget below represents the total funding at that level, not an additional amount.
Minimum funding: $500
With $500, we could test different approaches on a smaller dataset, prepare more environmental data and better estimate the computational resources needed for our planned research in Pará.
We estimate that $300 would go towards GPU computing and model training, $150 towards data processing and storage, and $50 would be kept for unexpected expenses.
Initial research program: $4,000
With $4,000, we would initially focus on an area of approximately 10,000 km² in the Brazilian state of Pará, for which we expect to need around 500–700 GiB of environmental data. This is the scale we originally planned for developing and testing our first predictive models.
Our priority would be to develop our first predictive models and compare them with simpler approaches. We would also continue seeking scientific feedback, although our ability to pay for consultation would be limited.
We estimate that $2,500 would go towards GPU computing and model training, $1,000 towards data processing and storage, and $500 would be kept for unexpected expenses.
Intermediate funding: $10,000 to $25,000
This would allow us to test more architectures, run several experiments in parallel, extend our geographical coverage and pay researchers for reviewing our methodology and results.
We would also further develop our prototype so that researchers and restoration practitioners could explore the predictions themselves.
Full funding: $44,000
With the full funding, we could carry out our planned research program and evaluate our models in selected areas across the Amazon, Cerrado and Atlantic Forest biomes.
Our estimated budget at this funding level is:
$18,000 for GPU computing, model training and experimentation.
$4,000 for data processing, storage and cloud infrastructure.
$8,000 for scientific consultation and independent evaluation.
$5,000 for platform development and deployment.
$4,000 for practitioner engagement and pilot preparation.
$2,000 for scientific documentation and publication.
$3,000 for unexpected expenses.
The total estimated budget is $44,000.
Our GPU budget is based on a preliminary estimate equivalent to 6,000 hours of H100 rental at approximately $3 per hour, including architecture testing, repeated experiments and final model training. We plan to refine this estimate through smaller training runs before committing most of the computational budget.
We expect to store our training data for 6–12 months and keep our trained model weights for longer. The data infrastructure budget also covers preprocessing, CPU computing and data transfers.
The scientific consultation budget would be used to compensate researchers for reviewing our methodology and helping us interpret our results. Other expenses include hosting, external services, travel and publication costs.
Most of the development will be done by the two of us. Our objective remains to have a working demonstrator by June 2027. The amount of funding we receive, its timing and the results of our experiments will determine how far we can develop its capabilities by then.
By publishing our findings and ecological scoring formula, we want other researchers and organizations to benefit from our work, even if our models do not perform as well as expected. We have not yet decided how access to a future operational version of Arbor would work.
We are Emil Fournier and Timothée Kronegg, two 17-year-old students from Switzerland, best friends and the founders of GreenTrust AI.
Emil Fournier, Co-founder and CEO
Emil focuses mainly on research, project direction and fundraising. He developed a preliminary formula to estimate the ecological condition of a plot of land. He has also contacted and met with experts in ecology.
Timothée Kronegg, Co-founder and CTO
Timothée is responsible for most of Arbor's technical development. He has already built an experimental predictive model and is working on the data infrastructure and researching machine learning approaches for ecological forecasting.
Our track record
Our first project with GreenTrust AI focused on reducing unnecessary AI queries and encouraging more efficient AI usage.
In May 2026, we received CHF 2,000 through the Françoise Demole Award at the Eduki competition. We also presented GreenTrust AI in front of approximately 2,100 people.
Receiving this award motivated us to dedicate more of our time to GreenTrust AI and start working on more ambitious projects.
We have been working on Arbor since October 13, 2026, alongside our studies.
Since then, we have built our experimental prototype, developed a preliminary ecological scoring formula, collected environmental datasets and conducted our first machine learning experiments.
More information about our work is available on the GreenTrust AI website and the Arbor project page.
Limited availability: Our studies and other obligations could slow down development, as neither of us works on Arbor full-time.
Insufficient model performance: Our models might not outperform simpler methods, as we have already experienced in our preliminary experiments.
Lack of ecological expertise: Neither of us is an expert in ecology, which could lead to problems in our methodology or interpretation of results.
Limited practical usefulness: Even accurate predictions might not provide enough information to improve restoration decisions.
Computational costs: Training and experimentation could be more expensive than expected.
Data quality: The available historical data might not be sufficient to achieve reliable predictions.
Depending on the results, we would consider using simpler models, reducing our geographical scope or focusing on fewer environmental variables.
If we conclude that our approach as a whole is not viable, we would document its limitations, publish our findings and reuse relevant components of Arbor within GreenTrust AI where possible.
In May 2026, we received CHF 2,000 as a prize from the Eduki competition for our first project with GreenTrust AI. This is the only external funding we have received so far.